Adopted
Alternative:
Reconstruct the Interchange
on New Location
(click
highlighted text below to show related graphics)
This alternative would include full replacement of the interchange
bridges in such a way that the highway and other deficiencies are
resolved. This would mean that portions of the interchange would
be relocated for this purpose, requiring additional right of-way.
Specifics to this alternative include the following:
The
three-lane section for eastbound US Route 6 would be extended
from Hartford Avenue to Broadway and the Plainfield Street on-ramp
would be moved to access the highway from the right side.
Westbound
US Route 6 would split from southbound Route 10 as a two-lane
section that will combine with the Tobey Street on-ramp to form
a three -lane section that will continue to the existing three-lane
section at Hartford Avenue.