Alternative 3:
Reconstruct the Existing Bridges

This alternative would include full replacement of the interchange bridges while maintaining the present alignment of the roadways. Construction of a new Route 10 northbound to Route 6 westbound movement is not included. New foundations would be constructed between the existing ones where possible, so that removal of the existing footings and piles would not be required.


   