Alternative 2:
Rehabilitate the Existing Bridges

This alternative would include repair and/or replacement of the major structural components of the infrastructure. The scope of these tasks is outlined below:

Repair

- Steel beams
- Concrete pier caps and columns

Replace

- Pavement and underlying waterproof membrane
- Concrete deck
- Beam paint systems
- Beam bearing devices
- Concrete pier caps and columns(where repair is deemed inappropriate)
- Vehicular railings

Construction of a new Route 10 northbound to Route 6 westbound movement is not included.